ISICClass
ISIC 4312—Site preparation
Class · International Standard Industrial Classification (Revision 5 (2024))
Where 4312 sits
What 4312 includes
- The preparation of sites for subsequent construction activities
- Clearing of building sites
- Earth moving: excavation, landfill, levelling and grading of construction sites, trench digging, rock removal, blasting, etc
- Drilling, boring and core sampling for construction, geophysical, geological or similar purposes
- Site preparation for mining • overburden removal and other development and preparation of mineral properties and sites, except oil and gas sites
- Building site drainage
- Drainage of agricultural or forestry land
What 4312 excludes
- Drilling of production oil or gas wells, see 0610, 0620
- Test drilling and test hole boring for mining operations (other than oil and gas extraction), see 0990
- Decontamination of soil, see 3900
- Water well drilling, see 4220
- Shaft sinking, see 4390
- Oil and gas field exploration, geophysical, geological and seismic surveying, see 7110
4312 in other systems
Looking up equivalents…